The basement project is progressing, just very slowly at this point. We decided we would frame the bathroom and the next bedroom and install the electrical in both, before we proceeded with the drywall in the first bedroom. We needed to have the inspector come out to look at some changes to the electrical and we figured, why not have all the electrical done so he could make just one more inspection. This seemed simple enough, considering how quickly we banged out that first room. However, a few factors are now coming into play that weren't before. First of all, I had squirreled away some funds for the start of the project. Now we have to have some time to squirrel away some more. Next, now that Lincoln is here and participating, we need to work around his schedule as well. He and I want to learn as we go so we can do this ourselves at some point. And lastly, we have a plumbing question that needs to be answered before we can build the next wall.

But here is what we have accomplished in the past week or two.

More electrical work in the first bedroom and hallway. The proper outlets have been installed. The first ones we put in did not meet a brand new code. They must now be the tamper resistant kind. Doug also put in a light fixture in the new hallway and wired for the other two. These will eventually be recessed lights.

Our friend, Jesse, came and put two new circuits in the box to accommodate the bathroom and the second bedroom.



Lincoln and I put in a heat run to the first bedroom and consulted with our friend Spencer to determine what our plan for cold air returns should be.


We have picked up the building materials we need for framing the next two rooms. Hopefully I can get a plumber out here today to answer our question and give us an estimate on future plumbing work. Once that is done we can proceed with framing.

In the meantime, maybe I'll start working on my kitchen backsplash today...